Reliance Petroleum Refinery And Petrochemical Complicated, Jamnagar

liquid chlorine storage tank

Construction on Reliance Petroleum’s (now referred to as Reliance Industries) refinery and petrochemical complex in Jamnagar, Gujarat, India, was began in December 2005. The Jamnagar complicated, mentioned to be one of the most superior on the earth, became operational in December 2008.

The refinery has a capacity of 580,000bpd and a polypropylene (PP) plant has a capacity of 900,000tpa. The PP plant is positioned adjacent to the Jamnagar Integrated Petrochemical Advanced, in Gujarat. The PP is produced utilizing propylene feedstock from the refinery advanced.

In February 2012, one of many crude distillation units of the refinery was shutdown for a planned maintenance turnaround. Gentle cycle oil hydrocracker and vacuum fuel oil hydrotreating items have been shutdown in September 2011 for upkeep and inspection.

Financing the Jamnagar polypropylene complex
The refinery and PP plant required an investment of $6bn. Throughout the first half of 2006 RPL accomplished the equity financing of the project by an initial public offering syndicated overseas currency loan services. The Export Import Bank of the United States supplied a $500m loan assure.

Refinery and petrochemical facility project management
Challenge administration, procurement and engineering services for RPL’s PP plant had been provided by Aker Kvaerner, who gained the contract in August 2007. The power includes two PP traces each with a capacity of 450,000tpa. The worth of the contract was not disclosed.

Major contractors linked to Reliance Petroleum’s PP plant
Aker Kvaerner’s AK Process business offered the fundamental engineering and challenge management on the PP facility. Aker Kvaerner Powergas, primarily based in Mumbai, India, provided the detailed design and engineering companies.

Petron Engineering was contracted in April 2007 to provide mechanical works for line one of the PP plant.

PP process equipment provided to the facility in Gujarat
Dow Global Applied sciences, a subsidiary of Dow Chemicals, was chosen to offer its Unipol course of technology for the PP facility.

The PP process all fuel-section technology relies on a fluidised bed reactor system. The stable and predictable system is designed to have much less movable tools.

The method contains purification, reaction, purging, vent restoration, additives and pelleting.
The mechanical operations of the know-how are simple and require much less main gear. The reactors are used to provide homopolymers and different copolymers. The method uses the same fuel part fluidised bed in the copolymer response state.

Provide of compression and valve know-how by GE
Throughout the second half of 2007, the oil and gas business of GE announced that is had been given a contract to produce compression know-how for the refinery and PP plant at Jamnagar. GE supplied three reciprocating compressors, which were manufactured by GE’s oil and fuel facilities in Florence, Italy, along with two screw compressors.

Metso Automation, a world engineering and expertise company, headquartered in Helsinki, Finland, was awarded the contract to produce valves and actuators for RPL’s PP plant.

Reliance Petroleum / RIL and background to its Indian plant project
The brand new refinery complex is situated adjacent to nw natural gas energy rebates RIL’s present refinery and petrochemical complicated. RIL already has PP capability at the Jamnagar site, together with capacity at one other site in Hazira, India.

RPL, the former RIL subsidiary which built the complex, was set-as much as harness value in the worldwide refining sector. RPL was merged nw natural gas energy rebates with RIL in 2009. The Jamnagar petrochemical complicated noticed main capacity expansions in polypropylene and paraxylene by 2008.

The refining plant alone has a capacity of 27 million tpa, which has increased to 108% of the working rates since April 2000. The whole advanced is unfold over 31 square kilometres.