oil producing companies in australia, nitrogen lawn fertilizer

georgia natural gas providers, oil producing companies in australia,Headquartered in Denver, Colorado we lead the industry with our competitive assets,

NYS Dept. Of Environmental Conservation

200,000 tons of methanol installation

Calendar of All Scheduled Public Conferences and Comment Durations – for websites in DEC’s cleanup programs oil producing companies in australia in Area 9.

The DEC’s Division of Environmental Remediation in Area 9 is chargeable for investigating and cleansing up sites throughout Western New York that had been contaminated from previous industrial activities. These sites that have been once financial engines for the region now contribute to environmental degradation, potential well being problems, city decay, decreased tax income, and inhabitants loss.

New York State’s environmental cleanup programs are reworking these sites, paving the way for restored ecological habitat, waterfront growth, clear power, new jobs, recreational alternatives, and enhanced appreciation of the surroundings. DEC is committed to cleaning up, restoring, and protecting Western New York’s atmosphere so it may be enjoyed and utilized each today and tomorrow.

Site names on the listing under are linked to mission pages, and site numbers are linked to the general public environmental remediation database. PDF documents available on the venture pages may be abbreviated, however full challenge documents are all the time available at the positioning’s doc repository.

To obtain electronic copies of Area 9 remedial program fact sheets as soon as they are issued, find the county you are involved in on the County Listserv web page and sign up!

Allegany

Click on to view Allegany Bitumens
truth sheet
Allegany Bitumens Asphalt Plant (Site Quantity C902019) – The Allegany Bitumens site is roughly 5 acres, situated in a primarily agricultural area. The positioning was previously used as an asphalt plant by Allegany Bitumens, Inc. and A.L. Blades and Sons, Inc. from roughly 1960 till 2005. Since 2005, the positioning has been unoccupied. A laboratory is situated in the northwest corner of the positioning. The laboratory was used for testing of aggregate and asphalt supplies. Trichloroethene (TCE) was reportedly used as a solvent in the testing operations, and former investigations indicated the presence of TCE and related risky organic compounds (VOCs) in an area northeast of the laboratory constructing. These VOCs were detected in shallow soil and groundwater at levels above New York State requirements. Blades Holding Firm, Inc. is addressing the positioning by the Brownfield Cleanup Program (BCP).
Cuba Landfill (Site Number 902012) – The Cuba Landfill site is a former municipal stable waste landfill and a brand new York State Class 2 inactive hazardous waste site. A category 2 site is one that poses a big threat to human well being and/or the setting and requires motion. It operated as a municipal landfill from the 1950s till 1981. The landfill accepted family, business and industrial waste, including industrial waste from Acme Electric Company (AEC). AEC disposed of solvents, polychlorinated biphenyls (PCB) capacitors, plating sludge and paint sludge. Wastes were deposited in trenches 10-15 feet large, 4-10 ft deep and tons of of toes lengthy. The treatment for the location entails consolidating wastes right into a single cell and capping the landfill.

Cattaraugus
202 Franklin Avenue (Site Quantity C905043) – This site is a 5.159-acre site situated in an city space in the city of Olean. The site is relatively flat and features a 1.83-acre paved parking lot. The remainder of the site is vacant land lined by brush, small to mature bushes, and uncovered remnants of former buildings (e.g. Concrete pads, bricks, and many others.). coal The location is presently inactive and zoned for commercial industrial use. The nearest residential area is zero.3 miles to the south and east. Till 1962 the site was used for manufacturing wastebaskets, vases, and so on. from reprocessed waste. Prior makes use of that appear to have led to site contamination include USTs, boiler, energy plant, painting, wood alcohol, and paper pulp operations. April 2017 Fact Sheet (5 page PDF, 201 KB)
Remedial Investigation/Alternatives Analysis Report (106 page PDF, four.97 MB)

July 2017 Reality Sheet (6 page PDF, 1.09 MB)
January 2017 Reality Sheet (5 web page PDF, 349 KB)
October 2016 Truth Sheet (four page PDF, 311 KB)
January 2011 Draft Remedial Investigation Work Plan (fifty three Web page PDF, 895 KB)

December 2016 Reality Sheet (5 page PDF, 420 KB)
Last Engineering Report (58 web page PDF, 1.35 MB)
Site Management Plan (65 web page PDF, 2.08 MB)
October 2016 Fact Sheet (4 web page PDF, 242 KB)
June 2015 Fact Sheet (5 page PDF, 272 KB)

Parcel 1: December 2016 Truth Sheet (5 page PDF, 335 KB)
Parcel 1: Final Engineering Report (227 page PDF, 1.92 MB)
Parcel 2: Ultimate Engineering Report (124 web page PDF, 2.74 MB)
Parcel three: Last Engineering Report (168 page PDF, 2.Forty eight MB)
Parcel 1: Site Administration Plan (88 page PDF, 1.Ninety four MB)
Parcel 2: Site Administration Plan (78 web page PDF, 1.Forty four MB)
Parcel 3: Site Administration Plan (88 web page PDF, 1.Fifty four MB)
Parcel 1: October 2016 Reality Sheet (5 web page PDF, 335 KB)
Parcel 2: October 2015 Reality Sheet (5 web page PDF, 199 KB)
Parcel 3: October 2015 Fact Sheet (5 web page PDF, 199 KB)
Olean Redevelopment Site Resolution Doc – Parcel 1 (PDF, 1.9 MB)
Olean Redevelopment Site Resolution Doc – Parcel 2 ( PDF, 1.6 MB)
Olean Redevelopment Site Resolution Document – Parcel three (PDF, 2.7 MB)
Olean Redevelopment Replace: Remedial Investigation/Alternatives Evaluation Report (Document 1 of 7) (145 page PDF, 1.Fifty eight MB)
Remedial Investigation/Options Evaluation Report – Appendix A (Document 2 of 7) (190 page PDF, 3.Ninety MB)
Remedial Investigation/Alternatives Evaluation Report – Appendix B (Doc 3 of 7) (7 page PDF, 1.16 MB)
Remedial Investigation/Alternate options Evaluation Report – Appendix C1 (Document 4 of 7) (one hundred web page PDF, 2.69 MB)
Remedial Investigation/Alternatives Evaluation Report – Appendix C2 (Document 5 of 7) (106 web page PDF, three.40 MB)
Remedial Investigation/Alternatives Analysis Report – Figures1 (Document 6 of 7) (15 page PDF, four.98 MB)
Remedial Investigation/Alternate options Analysis Report – Figures2 (Document 7 of 7) (25 page PDF, three.Sixty eight MB)

Chautauqua

Click on to view AlTech fact sheet
AlTech Specialty Steel (Site Number 907022) – The former AlTech Specialty Steel Corp. (AlTech) is an approximately ninety acre industrial site located in town of Dunkirk, Chautauqua County. Select demolition activities are slated to start in late February at the former steel plant. The demolition work can be focused on a portion of the Brigham Road Plant where historic pickling operations occurred. March 2017 Fact Sheet (four web page PDF, 165 KB)
August 2016 Fact Sheet (4 page PDF, 1.41 MB)
November 2015 Truth Sheet (four web page PDF, 230 KB)
Document of Determination (46 page PDF, 4.48 MB)
March 2014 Truth Sheet (4 page PDF, 279 KB)
September 2012 Reality Sheet (6 page PDF, 660 KB)

Erie

Click to view Gates Circle reality sheet
three Gates Circle (Site Number C915272) – This brownfield site is positioned at three Gates Circle in town of Buffalo. It consists of approximately 6.9 acres and encompasses the former Millard Fillmore Gates Circle hospital advanced. The site was initially developed for residential use and partially used for tricycle manufacturing pre-1900. By 1916 the site was starting to be operated as a hospital facility, with continued growth of the hospital complicated via the early 1970’s (i.e. Millard Fillmore Gates Circle Hospital). Now, the public is invited to touch upon a draft work plan being reviewed by DEC to analyze the site.
19 North Avenue (Site Number #C231093) – The site is positioned in the town of Buffalo oil producing companies in australia at the intersection of North Pearl Road and North Road, adjacent to the Buffalo Niagara Medical Campus. The site is vacant with a small parking area in the eastern portion of the site. The site fronts to North Street. The Phase I ESA indicated that the BCP Site was occupied by residential dwellings. By 1951, the residence at 23 North Road had develop into a radio station. By 1981, the residence at 19 North Avenue had been eliminated and replaced with a radio tower. City fill has been historically used throughout Buffalo to bring properties to grade throughout excavation and building.
April 2017 Reality Sheet (four page PDF, 193 KB)
Interim Remedial Measures (IRM) Work Plan (23 page PDF, 4.22 MB)

June 2017 Fact Sheet (5 page PDF, 261 KB)
January 2015 Fact Sheet (4 web page PDF, 175 KB)
Draft Site Investigation/Interim Remedial Measure Work Plan (100 web page PDF, 2.26 MB)

November 2016 Truth Sheet (5 page PDF, 786 KB)
July 2015 Fact Sheet (5 page PDF, 1.17 MB)
Remedial Motion Work Plan (39 web page PDF, 2.42 MB)
March 2015 Fact Sheet (5 web page PDF, 1.01 MB)
Options Analysis Report and Remedial Motion Plan (54 web page PDF, 3.34 MB)

January 2017 Truth Sheet (5 web page PDF, 346 KB)
January 2015 Reality Sheet (5 web page PDF, 153 KB)
Alternatives Analysis Report/Remedial Action Work Plan (seventy three page PDF, three.60 MB)

January 2017 Fact Sheet (5 web page PDF, 301 KB)
September 2015 Reality Sheet (4 web page PDF, 999 KB)
April 2017 Truth Sheet (4 web page PDF, 59 KB)
July 2015 Reality Sheet (5 web page PDF, 128 KB)

April 2017 Truth Sheet (four page PDF, 194 KB)
December 2015 Reality Sheet (4 web page PDF, 237 KB)
January 2017 Fact Sheet (4 web page PDF, 132 KB)
November 2016 Reality Sheet (4 page PDF, 130 KB)
September 2015 Reality Sheet (4 page PDF, 107 KB)
June 2015 Truth Sheet (5 page PDF, 145 KB)
Remedial Investigation/Various Evaluation Report (394 web page PDF, four.41 MB)

January 2017 Reality Sheet (four web page PDF, ninety two KB)
October 2016 Reality Sheet (four page PDF, 114 KB)
June 2015 Fact Sheet (4 page PDF, 274 KB)
Interim Remedial Measure Work Plan (50 web page PDF, 1.98 MB)
November 2014 Fact Sheet (4 page PDF, 247 KB)
Brownfield Cleanup Program Application (12 web page PDF, 498 KB)
Citizen Participation Plan (17 web page PDF, 791 KB)
Remedial Investigation Work Plan (forty nine page PDF, 1 MB)

February 2017 Truth Sheet (5 page PDF, 511 KB)
Work Plan (32 page PDF, 1.29 MB)
August 2017 Fact Sheet (5 page PDF, 1.Eighty one MB)
Remedial Investigation/Interim Remedial Measures/Alternatives Analysis Report (79 web page PDF, 5.58 MB)
March 2017 Truth Sheet (5 page PDF, 328 KB)
January 2016 Reality Sheet (5 web page PDF, 369 KB)

June 2017 Fact Sheet (5 web page PDF, 1.89 MB)
Could 2017 Truth Sheet (6 page PDF, 132 KB)
April 2013 Reality Sheet (4 web page PDF, 134 KB)
October 2010 Public Presentation on OU4 Cleanup Plan (17 Page PDF, three.67 MB)
August 2010 Alternate options Analysis Report (121 Page PDF, 582 KB)

Former Bethlehem Steel (Site Quantity 915009) – Bethlehem Steel, in the town of Lackawanna, was as soon as a major engine of financial productivity in Western New York. Through the years the complex grew to over 1600 acres. Environmental contamination varies throughout the property with 400 acres listed on the Registry of Inactive Hazardous Waste Disposal (SSF) Websites. This area is being addressed underneath the State’s Resource Conservation and Recovery Act (RCRA) Corrective Motion Program. An extra 500 acres are being remediated underneath the BCP by the current site owner, Tecumseh Redevelopment (see Tecumseh entries below).

The Bethlehem Steel Remaining Statement of Foundation for Operable Unit four: Coke Oven Space Groundwater was issued March 2017. It may be downloaded in two components: Part 1 of two (PDF) (1.91 MB) – Sections 1 by means of 7, Figures, and Exhibit A
Half 2 of two (PDF) (5 MB) – Exhibits B by E, Responsiveness Summary, and Administrative Document

June 2016 Reality Sheet (5 web page PDF, 525 KB)
Proposed Determination Document (9 page PDF, 544 KB)
Site Characterization (91 web page PDF, 2.Sixty two MB)

Lackawanna Incinerator (Site Quantity 915206) – This is positioned at 2960 South Park Ave. in the city of Lackawanna. The parcel was first used starting in 1927 because the municipal incinerator, continuing until 1980. The site is listed as a class “2” site in the State Registry of Inactive Hazardous Waste Websites. Report of Resolution – June 2017 (fifty nine page PDF, 2.67 MB)
April 2017 Truth Sheet (5 web page PDF, 1.05 MB)

September 2016 Reality Sheet (2 page PDF, 793 KB)
Might 2010 Reality Sheet (2 web page PDF, 141 KB)
November 2009 Groundwater Monitoring Report (29 web page PDF, three.3 MB)
May 2009 Soil Vapor Intrusion Research Results (9 web page PDF, 565 KB)
March 2009 Fact Sheet (2 web page PDF, 194KB)

August 2017 Fact Sheet (5 page PDF, 507 KB)
Remedial Investigation Work Plan (21 page PDF, 1.03 MB)

December 2016 Fact Sheet (4 page PDF, 152 KB)
December 2015 Fact Sheet (4 web page PDF, one hundred ten KB)
June 2015 Reality Sheet (4 page PDF, 200 KB)
Interim Remedial Measures Work Plan (Doc 1 of 6) (27 web page PDF, 1.88 MB)
Interim Remedial Measures Work Plan (Document 2 of 6) (1 web page PDF, three.9 MB)
Interim Remedial Measures Work Plan (Doc three of 6) (2 web page PDF, 3.40 MB)
Interim Remedial Measures Work Plan (Document four of 6) (2 page PDF, three.68 MB)
Interim Remedial Measures Work Plan (Doc 5 of 6) (28 page PDF, 3.33 MB)
Interim Remedial Measures Work Plan (Document 6 of 6) (34 page PDF, 4.Forty three MB)

July 2017 Reality Sheet (4 page PDF, 170 KB)
February 2017 Truth Sheet (5 web page PDF, 408 KB)
Remedial Investigation/Options Analysis (RI/AA) Report – (144 web page PDF, three.24 MB)

Niagara
402 and 430 Buffalo Avenue Site (Site Quantity C932164) – This BCP site is located at 401, 402 and 430 Buffalo Avenue, in Niagara Falls. The 401 Buffalo Avenue parcel is the situation of a former hotel and convention middle, parking areas and vegetated/landscaped areas. A portion of the former hotel has been demolished and work is underway on the development of a new construction. The 402 and 430 Buffalo Avenue parcels are at present vacant and had been a part of a former manufacturing facility. The positioning is at present vacant situated in a extremely developed mixed use business and residential area. The positioning is zoned commercial and redevelopment at the location has begun. Use of the three properties dates again to 1901 when a biscuit plant occupied the 402 and 430 parcels. This facility was named the Shredded Wheat Firm and was eventually sold to Nabisco and renamed “National Biscuit Shredded Wheat” (1933) and finally, “Nabisco Shredded Wheat” (1941). Operations included underground storage tanks famous as gasoline oil. Baking ovens, seemingly using the famous fuel oil, have been located throughout the manufacturing facility for drying uncooked materials, heating the assorted buildings and operations, and baking ultimate products. Additional operations included paper field manufacturing and printing, materials handling and shipping tools, maintenance of manufacturing gear and vehicles, seemingly application of pesticides and herbicides related to raw meals materials and completed items storage, and use of storage of paint, solvents, thinners, grease and lubricants common alongside former manufacturing operations. In 1956, the administration building closed and was leased to Union Carbide as a analysis facility. In 1963, that constructing turned the first home of Niagara County Neighborhood Faculty. That very same yr, the outdated manufacturing facility building was demolished. Data indicate that the 401 parcel was used as a park space alongside the Niagara River as a part of the greater manufacturing plant property. This site was later redeveloped into the previous resort facility in the early 1980’s.

Click on to view 600 River Street
Apartments fact sheet
600 River Street Apartments (Site Quantity C932161) – The location is situated in an city area at 600 River Street in town of North Tonawanda. The Niagara River runs along the western edge of the location and River Highway alongside the eastern side. The principle function of the location is a 2,940 sq. foot steel warehouse constructing. The property is mostly flat with a number of grass-lined piles of obvious soil/fill current on the eastern portion of the location. Miscellaneous piles of debris are located all through the property. The location was a portion of a higher parcel utilized by Niagara Iron Works/Tonawanda Iron Works from at the very least 1886 by at least 1972. Historic utilization included a number of railroad tracks all through the property and a pig-iron casting operation. The site was then vacant until 1988 when AJ Marine Construction, a business retailer, started operations and continued until 2008. Since 2008 the metal constructing on the positioning has been used as a warehouse.
815 River Road (Site Quantity B00178) – The 815 River Street site is a 1 acre parcel positioned in a business/industrial space of North Tonawanda in Niagara County. It is situated on the east side of River Road, instantly throughout the road from town’s waste water remedy plant. The site was used for a number of decades for automotive repairs, most just lately by a company which leased and maintained college buses. The presence of USTs have been documented on the positioning as far back as 1961. It is believed that several of these tanks leaked petroleum products into site soils. Town of North Tonawanda and the DEC cleaned up the location between 2003 and 2007. The cleanup actions, referred to as interim remedial measures, were selected as the ultimate treatment for the site since they successfully addressed contamination.

Click to view 1501 reality sheet
1501 School Avenue (Former Union Carbide) (Site Quantity C932134) – The site was used for heavy industrial manufacturing from a minimum of 1910 to the mid-1980s, and at one time was half of a larger Union Carbide Company manufacturing complicated encompassing the positioning and the jap and western adjoining parcels. Earlier investigations of the location and the adjoining eastern site (former Hazorb Site) have identified elevated SVOCs, metals and PCBs as contaminants of concern. Areas of concern embody former ASTs and USTs areas, former transformer areas, soil/fill/debris piles, areas of drum storage and ground drains, sumps and vaults, areas of visibly-stained soil, former unlawful scrapping areas and quite a few areas of general dumping.

Click on to view Covanta reality sheet
Covanta (Site Number C932160) – The proposed Covanta Niagara Rail-to-Truck Intermodal Facility is positioned at 137 47th Road, Niagara Falls. The venture site encompasses roughly 15 acres alongside the railroad tracks on the eastern edge of a bigger, former industrial advanced. The undertaking site is occupied by one approximately 13,seven-hundred sq ft constructing formerly utilized for the maintenance and restore of locomotives; an inactive rail yard; and concrete ground slabs representing remnants of the previous industrial advanced. The on-site construction will not be at present utilized and is in a deteriorated state. The remaining parts of the challenge site typically encompass aged asphalt, concrete and gravel surfaces with some successional vegetation occurring alongside the eastern site boundary. The challenge site was owned and operated by the Union Carbide Company Metals Division, which first developed the complex within the early 1900’s. The plant produced particular alloys, tungsten, ferroalloys, calcium carbide and ferrovanadium ferrotungsten. Union Carbide’s Linde Division also operated a welding flux manufacturing facility on the plant property. Could 2013 Update: Motion is about to start that may deal with contamination.

Click to view Durez fact sheet
Durez North Tonawanda Facility (Site Quantity 932018) – A drainage improvement and wildlife revitalization challenge is deliberate for the former Durez Plastics site located at seven hundred Walck Road in town of North Tonawanda in Niagara County. The site is at the moment operated by Glenn Springs Holdings, Inc. This work is being carried out as part of the location’s Operation, Upkeep and Monitoring (OM&M) necessities and will improve space floor drainage, cut back/eliminate potential surface runoff from the site to off site areas, remove trees and vegetation that could impression the perimeter interceptor trench, which supplies groundwater containment for the positioning, and provide a response to neighborhood considerations concerning floor runoff from the positioning. September 2013 Update: A drainage enchancment and wildlife revitalization mission is planned.
Durez Company – Niagara Falls (EPA Id. No: NYD002103216) – Durez submitted an application to renew its 6 NYCRR Part 373 Hazardous Waste Management Permit at its facility in Niagara Falls. DEC accepted written comments on this utility from December 19, 2012 to February three, 2013.

Click on to view Eighteenmile Creek fact sheet
Eighteenmile Creek Sites (Site Quantity 932121 and 932156) – Eighteenmile Creek consists of two sites, Eighteenmile Creek Corridor Site (between Clinton and Harwood Streets in the town of Lockport, site number 932121) and Eighteenmile Creek Sediments Site (from Harwood Road in town of Lockport to Lake Ontario, approximately 15 miles, site number 932156). The sites embody the creek itself and the millrace at the Flintkote property, the Flintkote plant, the former United Paperboard property, Upson Park, the White Transportation property, and Water Avenue residential properties. The Flintkote plant is suspected to be the foremost source of primarily PCB and lead contamination at the positioning. Flintkote started operations as a producer of felt and felt merchandise in 1928. Manufacturing continued at Flintkote until December of 1971,
Click to view Vogue Outlets reality sheet when operations ceased and the plant closed.
Ekonol (Site Number V00653) – The Ekonol Polyester Resins facility is an active manufacturing facility located in the Town of Wheatfield. An underground concrete tank was used on the Ekonol facility from the 1970s through 1999 for assortment of waste waters from the building flooring drain system. Throughout a tank removal carried out in 1999, TCE and Phenols had been detected in site soils. Investigations indicate VOCs (such as TCE and breakdown products) and SVOCs (resembling Phenol) at excessive concentrations in soil, overburden and bedrock groundwater. BP America, Inc. is addressing contamination at the positioning via the Voluntary Cleanup Program.
FMC Company (Site Number 932014) – The FMC site includes 102.85 acres located within the southwest nook of the Village of Middleport. FMC Corporation’s Middleport Facility is a pesticide formulation and packaging plant that formerly manufactured arsenic-based and other pesticide products. Because of past manufacturing operations and waste disposal practices beginning within the 1920s at this facility, chemical releases have occurred at the site that have affected sediment, surface water, soil, and groundwater at the facility’s property and in adjoining off-site areas. March 2017 Fact Sheet – Part three announcement (4 page PDF, 153 KB)
March 2017 Fact Sheet – Residential cleanup (4 web page PDF, 154 KB)

July 2015 Fact Sheet (5 page PDF, 194 KB)
March 2012 Remedial Investigation Report, Building 7 (76 Web page PDF, four.75 MB)
March 2012 Remedial Investigation Report, Constructing 8 (seventy four Page PDF, four.5 MB)
March 2012 Remedial Investigation Report, Building 10 (seventy two Page PDF, 4.73 MB)
June 2010 Remedial Investigation Work Plan, Constructing eight (20 Web page PDF, three.34 MB)
June 2010 Remedial Investigation Work Plan, Constructing 10 (23 Page PDF, three.15 MB)

March 2017 Fact Sheet (6 page PDF, 192 KB)
Preliminary Remedial Investigation Work Plan (26 web page PDF, three.Ninety seven MB)
Site Characterization Report 2013 (32 web page PDF, 1.71 MB)
Site Characterization Report 2013 – Appendices (one hundred twenty page PDF, 3.79 MB)
Supplemental Site Characterization Report 2014 (71 web page PDF, 3.Forty eight MB)

Wyoming
Wyoming County Hearth Training Center (Site Number V00604) – The main site features include a fireplace Training Facility building and a storm water retention pond. The site is presently used for fire coaching purposes, after development of a brand new cutting-edge enclosed facility.